For manufacturers ================= In manufacturing mode the menu opens with a Factory section: production and bills of material, job work and batch release. [0:04] Bills of material A bill of material says what goes into one batch, how much is lost, and the overheads. Changing it adds a new version; the old one stays, because it explains what earlier runs cost. [0:17] Planning a run Plan a run: choose the product and the quantity, and Falcon works out the material it needs, wastage included, against what is in the store. [0:28] What a run cost A recorded run takes the materials out of the store and puts the product in, at what the materials actually cost plus overheads — one stock journal in the books. [0:40] Job work Material sent out to a job worker is tracked until it comes back, and flagged once it has been out longer than the law allows. Falcon. Start free. This video has no sound. Every word of it is in the captions and in this transcript.